
Geçitkale
A plot located in an emerging area, offering development potential suitable for villa, twin-house and apartment typologies.
Gecitkale Overview
Geçitkale Phase II is located in a high-potential area surrounded by new residential zones and planned in line with Fasıl 96, suitable for single-storey/twin villas and multi-storey apartment typologies.
Key Facts
Core parameters of the plot. Final implementation is subject to approval by the relevant authorities.
*For information purposes only; zoning/permit parameters may vary per parcel and according to decisions of the competent authorities.
Gallery
Drone Images





*On mobile, tap an image to enlarge and pin it; tap again to return to the default view.
Location & Access
Close to daily amenities, the coastline and main road connections. The times below represent approximate driving durations.
- Close to the asphalt road with quick access to regional connections.
- Low slope; regular parcel shape allowing easy site planning.
- Quiet surroundings; an emerging residential area.
Overview & Development Potential
Geçitkale Phase II is located in a developing area surrounded by new residential zones and planned under Fasıl 96, suitable for single-storey/twin villas and multi-storey apartment typologies.

Zoning: Fasıl 96 — permitted typologies: single-storey villa, twin villa, multi-storey apartment.

Indicative construction allowance for an average plot: up to ~5 floors (for information purposes).

Location advantage: Long Beach 12 min, Famagusta 18 min, Ercan Airport 25 min.

Infrastructure works in the area are ongoing; parceling and title deed processes are in place.
Planning & Infrastructure
Zoning principles and the plot’s readiness status are summarized with visuals. Final approvals are subject to the relevant authorities.
Zoning Basis
Development under Chapter 96 — planning in line with local regulations.
Permitted Typologies
Single-storey villas, semi-detached villas and multi-storey apartment scenarios.
Height Information
For information purposes: on an average plot, development up to ~5 floors is possible.
Infrastructure Works
Ongoing works in the area for road, electricity and water infrastructure.
Parcel & Title Deed
Parceling and title deed processes are prepared / at an advanced stage.